Superconductor Docs

Development environment

Configure where your AI agents run and how your app previews work.

Development environment settings page showing resources, packages, build commands, startup commands, and the terminal

The development environment is where your AI agents write and test code. Think of it as a cloud-based dev machine that Superconductor spins up for each project. Your agents clone your repos, install dependencies, and run your app—all in this environment.

If you run into any issues during dev environment setup, reach out to us—our team would be happy to get on a call and walk you through the setup for your specific project or to answer questions over email.

What can I do while setup is in progress?

Automatic Environment Setup starts as soon as you create a project with repos. (It doesn't run for projects without repositories until you add one.) While it runs—or if it's waiting for you to provide secrets—you can still start using Superconductor:

FeatureBefore setup is completeAfter setup is complete
Agents update code✅ Yes✅ Yes
Agents commit and push to GitHub✅ Yes✅ Yes
Live app previews❌ No✅ Yes
Agents run tests⚠️ Limited✅ Yes
Agents run build scripts⚠️ Limited✅ Yes

Until setup finishes, agents can still read and write code, but they may not be able to run your app, test it fully, or see it in action.


Automatic Environment Setup

Automatic Environment Setup showing the three-pane UI with chat, terminal, and suggested environment configuration

When you create a new project with repos, Superconductor automatically kicks off Automatic Environment Setup. An AI agent analyzes your repo, figures out what packages, build commands, startup commands, and services your project needs, and suggests a complete configuration for you.

Automatic Environment Setup appears in the Recent Activity sidebar while it runs, so you can monitor progress from the rest of the app.

The project dashboard also shows a live setup banner while setup is running, when it needs your input, and when it finishes. When setup needs input, the banner explains what's needed—for example, providing secret values so an initial setup can continue, or reviewing suggested changes when you rerun setup for a project that is already configured.

Automatic Environment Setup banner explaining that Superconductor is building and saving a reusable project environment snapshot

Automatic Environment Setup banner explaining that setup needs secret values before it can continue, with an Add details button

Automatic Environment Setup success banner explaining that implementations start from the saved environment snapshot

Getting to the setup page

Automatic Environment Setup starts automatically when you create a project, but the agent runs in the background. To see its progress or chat with the agent, open the setup page.

On the project dashboard, use the environment setup banner below the ticket input. The banner shows the current setup status; if the agent needs more information, click Add details to open the setup page and continue the conversation.

Project dashboard showing the environment setup banner below the ticket input with an Add details button

You can also get there from Project Settings by clicking Automatic Setup in the Development Environment section.

How it works

  1. When you create a project (or click Automatic Setup in Project Settings), Superconductor spins up a cloud instance and runs an agent that reads your repo's code, docs, and config files.
  2. The agent suggests a full environment configuration: packages, build commands, startup commands, secrets, and HTTP services.
  3. You can inspect the suggestions in a three-pane UI:
    • Chat (left): Talk to the agent, ask questions, or request changes
    • Terminal (middle - disabled by default): A live terminal connected to the cloud instance
    • Environment (right): The agent's suggested configuration, rendered in a readable summary of resources, packages, build commands, startup commands, HTTP services, and secrets
  4. If the Automatic Environment Setup agent identifies secrets your project needs (API keys, database URLs, etc.), it'll prompt you to provide the values through a form in the chat. The agent can detect which secrets are needed but can't guess the values. If the project already has values saved for those secrets, the agent tries them first and only asks for the ones that are missing or don't work. If setup is blocked waiting for secret values, you'll also get an email titled Automatic environment setup needs your help with a Provide input button that links back to the setup page.

The secrets form in the chat pane, prompting the user to provide values for environment variables the agent identified

  1. For new projects, the agent automatically applies the configuration once it's validated. If the project has startup commands, HTTP services, and all required exported secrets filled in, the agent first tests that the live preview works before applying. If setup is waiting for secrets, it continues after you provide them. For projects that already have an environment configured, you'll see Apply to Project and Don't Apply buttons at the bottom of the Environment pane to accept or dismiss the suggestions. They stay in place while you scroll, so you don't have to scroll past long setup logs to reach them.

If you'd rather skip the Automatic Environment Setup agent and configure everything by hand, click Configure Manually in the setup page header to go straight to manual configuration.

Stuck on setup? Click Get help in the setup page header to open a live chat with our team. If setup fails, the failure banner on the project dashboard has a Get help link too. When live chat isn't available, it opens an email to our support team instead.

After the configuration is applied (automatically or manually), Superconductor builds an environment snapshot. Once the build succeeds, agents can start working on tickets with full access to your running app, and you'll be able to use live previews.

Sometimes the agent can start your app, but needs a small repo change to make the preview work inside Superconductor, such as allowing the preview host or relaxing iframe headers in development. When that happens, Automatic Environment Setup will add a temporary startup-command patch so previews work immediately. It will then auto-create a linked ticket in your project and launch an implementation to make the same change properly in your repo.

Automatic Environment Setup runs on Superconductor's own Codex credentials. Your API key or connected plan isn't used for it.

What the agent looks for

The agent reads your repo to determine:

  • Resources: How much CPU, memory, and disk your environment needs
  • Packages: Which language runtimes you need (Node.js, Python, Ruby, Docker)
  • Build commands: How to install dependencies, set up databases, and build assets
  • Startup commands: How to start your dev servers
  • Secrets: Which environment variables need sensitive values (API keys, tokens, etc.)
  • HTTP services: Which ports your app listens on, for live previews

It prioritizes existing setup scripts (like bin/setup, bin/dev, or Makefile targets) over reinventing the wheel. If your project uses Docker for development, it'll configure Docker-based commands.

Editing your environment after setup

Project Settings showing a configured development environment with Automatic Setup and Manual Setup buttons

Once the agent's suggestions have been applied, you can make further changes at any time:

  • Manual edits: Click Manual Setup in the Development Environment section of Project Settings to open the manual configuration page, where you can edit commands, packages, secrets, and services directly.
  • Re-run Automatic Environment Setup: Click Automatic Setup in Project Settings to start a fresh Automatic Environment Setup session. You can also click Restart from within an existing setup page if the current run got stuck, picked up stale suggestions, or you changed your code and want a fresh pass from scratch.

Older projects: If your project was created before Automatic Environment Setup was available, it won't have run automatically. If your project already has a configured environment, you'll see Automatic Setup and Manual Setup buttons in the Development Environment section of Project Settings. If your project doesn't have a configured environment yet, you'll see a Configure button that takes you to manual configuration, where you can click Automatic Setup to start Automatic Environment Setup instead.


Manual configuration

You can also configure your dev environment by hand. This gives you full control over every setting.

Getting to manual configuration settings

There are a few ways to reach the manual configuration page:

  • From the Automatic Environment Setup page: Click Configure Manually in the header to go directly to manual configuration.
  • After Automatic Environment Setup: Once you've applied the agent's suggestions (or if your environment is already configured), a Manual Setup button appears in the Development Environment section of Project Settings.
  • Older projects: Projects created before Automatic Environment Setup was available may show a Configure button in the Development Environment section of Project Settings, which links directly to manual configuration.

The manual configuration page has two main sections: Build (one-time setup) and Startup (runs each time).

Development environment settings page showing build commands and startup commands sections

For a deeper explanation of what runs when, see Lifecycle.

At the top of the page, you'll also find two action buttons:

  • Rebuild Development Environment: Triggers a fresh environment snapshot build using your current configuration. This button is disabled if you haven't configured any setup commands, startup commands, packages, HTTP services, or secrets yet.
  • Automatic Environment Setup: Opens the Automatic Environment Setup page. If you've run it before, it takes you to the existing session. Otherwise, it starts a new one.

Build settings

These settings determine how your environment snapshot is built. Changes here require rebuilding your environment.

Resources

Configure the compute resources for your environment:

  • CPU: 1-8 cores
  • Memory: 1-16 GB RAM
  • Disk: 2-60 GB storage

Start with the defaults (1 CPU, 4 GB RAM, 10 GB disk) and bump them up if your builds are slow or running out of memory.

Packages

Select which language runtimes to install:

  • Docker: Enable if your project needs containerization
  • Node.js: Pick your version (20, 22, 24, 26)
  • Python: Pick your version (3.10, 3.11, 3.12, 3.13, 3.14)
  • Ruby: Pick your version (3.2, 3.3, 3.4, 4.0)

Only enable what you need—more packages mean longer startup times.

The GitHub CLI (gh) is already installed in every environment, so you don't need a build command for it. When your repositories are connected through the Superconductor GitHub App, gh is signed in with the app's access to them. Network sandboxing still applies: gh commands that use GitHub's GraphQL API may be blocked, and gh api with the REST API is the alternative. It isn't signed in to your own GitHub account; to use that instead, set GH_TOKEN from a secret. Pushing and pulling code works without any of this — Superconductor handles Git authentication for you.

FFmpeg (ffmpeg and ffprobe) is also already installed, so agents can process video without installing anything. For example, they can pull frames from a screen recording you attached to a ticket, trim a demo clip, or check a video's length and resolution. If an agent reports that ffmpeg isn't found, click Rebuild Development Environment so your snapshot picks up the latest preinstalled tools.

Secrets

Store sensitive values like API keys securely. Use them in your commands with the {{ secrets.SECRET_NAME }} syntax.

Example:

export API_KEY={{ secrets.MY_API_KEY }}

Each secret has an Export to Environment toggle. When enabled, the secret is automatically available as an environment variable ($SECRET_NAME) across all build commands, startup commands, terminal sessions, and agent executions — no manual export needed. Exported secrets are shown with an Exported to environment badge in the development environment summary.

Secrets are encrypted and redacted from build logs.

Superconductor identity token

Startup commands, terminal sessions, and agent executions also get SC_IDENTITY_TOKEN_FILE. This points to a short-lived signed JWT that identifies the running Superconductor workload.

Use the file path from the environment variable instead of hard-coding the current path:

jwt="$(cat "$SC_IDENTITY_TOKEN_FILE")"

Services can verify the token with Superconductor's public keys at /.well-known/jwks.json. Superconductor also publishes OIDC-style metadata at /.well-known/openid-configuration.

Build commands

Commands that run once when building your environment snapshot. Use these for:

  • Installing dependencies (npm install, bundle install)
  • Setting up databases
  • Building assets
  • Any one-time setup

Important things to know:

  • Each command block runs in its own shell. Exports like export API_KEY={{ secrets.API_KEY }} are only available within that block.
  • cd into your repo directory first—repos are cloned to /workspace/<repo-name>
  • To make environment variables available across command blocks and for running agents, enable Export to Environment on the secret. It will be exposed as $SECRET_NAME.

Example build commands for a Node.js app:

cd /workspace/my-app
npm install
npm run build

Example for a Rails app:

cd /workspace/my-rails-app
bundle install
rails db:setup

Startup settings

These settings run every time an agent starts working on your project.

Startup commands

Commands that start your development servers. Each startup command has a Run in background checkbox — enable it for long-running processes like dev servers, workers, and file watchers. The last startup command always runs in the background automatically, and background commands are labeled in the development environment summary.

Each startup command block runs in its own shell. Secrets with Export to Environment enabled are available as $SECRET_NAME across startup command blocks and agent executions.

Example for a Node.js app:

cd /workspace/my-app
npm run dev

Example for a Rails app:

cd /workspace/my-rails-app
bin/dev

HTTP services

Tell Superconductor which ports your app uses so we can create live previews.

FieldDescription
NameA label for the service (e.g., web, api, vite)
PortThe port your service runs on (e.g., 3000, 8080)
PrimaryCheck this for the main service to show in App Preview. Only one service can be primary—this is what loads in the preview pane by default. Other services can also be previewed using the dropdown menu in the preview pane header.

These are the default ports for common frameworks:

App typeService namePort
Node/Viteweb3000 or 5173
Railsrails3000
Djangoweb8000
Next.jsweb3000

We automatically create environment variables for each service. The pattern is AGENT_{SERVICE_NAME}_HOST, where the service name is uppercased and hyphens become underscores:

  • AGENT_WEB_HOST for a service named "web"
  • AGENT_API_HOST for a service named "api"
  • AGENT_MY_APP_HOST for a service named "my-app"

These variables contain the hostname of your live preview URL. Use them in your startup commands if your app needs to know its external URL at runtime—for example, to configure CORS, set callback URLs, or generate absolute links.

cd /workspace/my-app
export BASE_URL=https://$AGENT_WEB_HOST
npm run dev

You can also write them to a .env.local file from your startup commands:

cd /workspace/my-app
echo "BASE_URL=https://$AGENT_WEB_HOST" > .env.local
npm run dev

Getting your app to work in an iFrame

Some frameworks need extra development-only configuration before the preview will load inside Superconductor. In particular:

  • If your framework restricts allowed hosts, add AGENT_<SERVICE_NAME>_HOST
  • If it sends X-Frame-Options: DENY or SAMEORIGIN, remove that header or replace it with a CSP frame-ancestors rule that allows Superconductor
  • If auth works in a normal tab but not in the embedded preview, set cookies to SameSite=None and Secure in development

See Framework examples for code snippets.

Framework examples

These examples assume you defined a primary HTTP service named web or rails, so Superconductor provides AGENT_WEB_HOST or AGENT_RAILS_HOST.

Rails

Rails apps commonly need both host authorization and iframe-friendly headers. A typical development setup looks like this:

# config/environments/development.rb
if ENV["AGENT_RAILS_HOST"].present?
  agent_host = ENV["AGENT_RAILS_HOST"]

  config.hosts << agent_host

  # Route helpers like users_url
  routes.default_url_options = { host: agent_host }

  # Mailers and other code that generates absolute URLs outside a request
  config.action_mailer.default_url_options = { host: agent_host }
  config.action_mailer.asset_host = "https://#{agent_host}"

  # If you use Action Cable / Turbo Streams in preview
  config.action_cable.url = "wss://#{agent_host}/cable"
  config.action_cable.allowed_request_origins = ["https://#{agent_host}"]

  config.content_security_policy do |policy|
    policy.frame_ancestors :self, "https://superconductor.com", "https://*.superconductor.com"
  end

  config.action_dispatch.cookies_same_site_protection = :none
  config.assume_ssl = true
end

Node.js with Vite

Vite often needs the preview host added to allowedHosts. If you use Helmet or another security middleware, also allow Superconductor in frame-ancestors.

// vite.config.ts
import { defineConfig } from "vite";

export default defineConfig({
  server: {
    host: "0.0.0.0",
    allowedHosts: [
      process.env.AGENT_WEB_HOST,
    ].filter(Boolean),
  },
});
// Express + Helmet example
app.use(
  helmet({
    frameguard: false,
    contentSecurityPolicy: {
      directives: {
        frameAncestors: ["'self'", "https://superconductor.com", "https://*.superconductor.com"],
      },
    },
  }),
);

Next.js

Next.js uses allowedDevOrigins to allow requests to dev-only assets and endpoints from a hostname other than the one the dev server started with. If you set restrictive security headers, also allow Superconductor in frame-ancestors.

// next.config.js
const agentHost = process.env.AGENT_WEB_HOST;

/** @type {import('next').NextConfig} */
const nextConfig = {
  allowedDevOrigins: agentHost ? [agentHost] : [],
  async headers() {
    return [
      {
        source: "/:path*",
        headers: [
          {
            key: "Content-Security-Policy",
            value: "frame-ancestors 'self' https://superconductor.com https://*.superconductor.com;",
          },
        ],
      },
    ];
  },
};

module.exports = nextConfig;

If you already set CSP in middleware.ts, proxy.ts, or another reverse proxy, update the existing frame-ancestors rule there instead of adding a second CSP header.

Django

Django usually needs the preview host added to ALLOWED_HOSTS, plus iframe and cookie settings for embedded auth flows.

# settings.py
import os

agent_host = os.getenv("AGENT_WEB_HOST")

if agent_host:
    ALLOWED_HOSTS.append(agent_host)
    CSRF_TRUSTED_ORIGINS.append(f"https://{agent_host}")
    X_FRAME_OPTIONS = "ALLOWALL"
    SESSION_COOKIE_SAMESITE = "None"
    SESSION_COOKIE_SECURE = True
    CSRF_COOKIE_SAMESITE = "None"
    CSRF_COOKIE_SECURE = True

If you use django-csp, prefer a CSP frame-ancestors rule over relying only on X_FRAME_OPTIONS.


Building your environment

After configuring your settings, click Save Development Environment. This triggers a build.

Tracking build progress

Watch the build log in the Terminal pane on the right side of the Dev Environment Edit page or at the top of the Dev Environment Edit page. You'll see:

  1. Starting - Environment is spinning up
  2. Running - Each command executes with a spinner
  3. Finalizing - Snapshot is being saved

What success looks like

When the build completes successfully, you'll see a green checkmark at the top of the Dev Environment Edit page and the message:

"Development environment built successfully!"

Dev Environment Edit page showing the development environment built successfully message

Once built, agents can start working on tickets immediately.

What a running preview looks like

When you launch a new implementation, your startup commands automatically run. Once they complete, your live preview loads.

You can see the live App Preview above the terminal:

Implementation view showing live app preview and terminal


Tips for success

  1. Start simple: Get a basic build working before adding complexity
  2. Test locally first: Make sure your setup commands work on your own machine
  3. Use the terminal: It's your best friend for debugging
  4. Check the logs: The terminal shows exactly what's happening
  5. One thing at a time: Add commands incrementally and rebuild to verify each step

Troubleshooting

Build command failures

If a build command fails, you'll see the error in the terminal pane with:

  • The command that failed
  • Exit code
  • STDOUT and STDERR output

To fix:

  1. Update your build commands in Settings
  2. Click Rebuild Development Environment (or Save Development Environment if you made changes)

Common issues:

  • Missing dependencies: Make sure you're installing everything your app needs
  • Wrong directory: Remember to cd /workspace/<repo-name> first
  • Missing secrets: Check that all required secrets are configured
  • Framework blocks the preview host or iframe: Add the relevant AGENT_<SERVICE_NAME>_HOST and iframe settings from Framework examples

Startup command issues

Startup commands run each time an agent starts. The preview loading screen shows each command's progress and output in real time, making it easy to spot failures.

If a command shows a red "Timed out" indicator, it exceeded the five-minute timeout. Try simplifying the command or splitting it into smaller steps.

For further debugging:

  1. Go to any Ticket Implementation in your project
  2. Click Show Terminal to run the startup commands manually
  3. Look for errors in the output

Common issues:

  • Port already in use: Make sure you're not trying to start multiple servers on the same port
  • Wrong port in HTTP services: Double-check the port matches what your app actually uses
  • App crashing on startup: Check the command output on the loading screen or in the terminal
  • Command timeout: A startup command took longer than five minutes. Consider optimizing or splitting it.

Previews not loading

See Preview not loading? in the Live Preview docs for troubleshooting steps.


Need help?

If you're stuck, reach out to us. Our team would be happy to get on a call and walk you through the setup for your specific project or to answer questions over email. Include:

  • Your project name
  • What you're trying to do
  • Any error messages you're seeing

On this page